PVD ORV-026-014
Dimensional inspection report
- Part
- Connecting bracket
- Drawing
- BLN-2407 · revision B
- Job / Manufacturing order
- AF-026-014 / OF-1048
- Stage / part
- Final inspection / part 01
Scroll the table horizontally to see all measurements and inspection results.
| Balloon | Zone | Requirement | Limits | Measurement | Equipment | Result |
|---|---|---|---|---|---|---|
| 1 | A2 | 120 ± 0,2 | 119.80 to 120.20 | 120,06 | Calliper PC-01 | Conforming |
| 2 | B3 | 80 ± 0,1 | 79.90 to 80.10 | 80,13 | Calliper PC-01 | Nonconforming |
| 3 | B2 | Ø12 H7 | 12.000 to 12.018 | 12,009 | Bore gauge AL-03 | Conforming |
Observation Balloon 2 exceeds the upper limit by 0.03 mm. Deviation recorded as NC-014.