RacinaireExplore our software
EN

Quality guide

Prepare AS9102C FAI records

Gather first article identification and characteristic records needed for Form 3 of the FAIR package.

Identify the first article

FAI (First Article Inspection) formalises the verification of a first article in aerospace. Gather the applicable definition, its revision, part identification and customer requirements.

Link each requirement to its result

Assign a reference to each characteristic to record. Retain the drawing zone, required value, result and, where needed, characteristic designators or the nonconformance reference.

Prepare the information for Form 3

In Bulleon, enable FAI mode to enter the FAIR identifier, part number, serial number or lot, and designators. The ballooned drawing, self-inspection sheet and report help prepare Form 3 records.

The complete FAIR package must be prepared according to applicable and customer requirements.

Example dimensional inspection report
Preview of Bulleon software.

AS9102C reference — SAE International

Discover Bulleon

Keep exploring.